Home / Services / Bathroom and interior renovation

Bathroom and interior renovation

We start with a 3D visualization — so you see the result before we buy materials. Then plumbing-core demolition, new pipework, tiling, sanitary fittings, and handover. A complete bathroom usually in 2–3 weeks.

Bathroom and interior renovation · Karlovy Vary region
01 / What we do

What we take care of.

We start with a 3D visualization — so you see the result before we buy materials. Then plumbing-core demolition, new pipework, tiling, sanitary fittings, and handover. A complete bathroom usually in 2–3 weeks.

We've been doing plumbing-core renovations since 2006. Every bathroom is a little different — building age, layout, owner's vision — so we start with a 3D design so you see the outcome before we buy materials. For serious clients we also arrange the design documentation and the building-authority notification.

A typical panel-building bathroom takes 2–3 weeks — core demolition, new pipework, tiling, fixtures, handover. Promising "in a week" we consider disrespectful to neighbours and to the trade. On completion you receive electrical and gas inspection reports, water pressure tests, drainage tightness certificate, water-meter replacement protocol, and manufacturer warranties. Our work warranty is 36 months; an indicative budget for a panel-flat renovation typically lands at CZK 100,000–250,000.

Since 2006
Plumbing-core specialty
36 months
Warranty on our work
100–250 K
Indicative budget (CZK)
2–3 weeks
Typical timeline

Let's prepare a budget together.

Free, no-obligation consultation. We come to you within two weeks.

Request a quoteOr call us directly: